Alberta Wagon Trekkers were able to successfully complete the planned maintenance work to the Panther-Dormer Wagon trail.
A few before photos and an after video of the first hill climb to show the difference in that section.
The group was able to re establish the trail from the first – second river crossing back to original design. Ensuring all drainage pathways were cleaned and re sloped. Culverts all cleaned and erosion rocks in places. Trail erosion repaired and all large boulders removed.